Mapping matrix

Every Milzet Knowledge, Practical and Workplace module linked to stipend worker tasks, VR state and evidence — for the dual-track Milzet + BusinesSite Core Team pilot.

Code Component Outcome / module ELO VR state Worker work (stipend) Evidence
KM-01 Knowledge KM-01 · Introductory Studies for Project Managers Foundation for ELO 1–4 Voice study Voice induction: record a 4-minute 'why this work, why this host' brief; answer ethics scenario by voice Signed induction card + ethics reflection (voice transcript + optional handwritten notes)
KM-02 Knowledge KM-02 · Project Integration Management ELO 1–4 Voice study Dictate a one-page project charter for the assigned host project; list integration points across scope/time/cost Charter v0.1 auto-drafted from voice; change-control stub
KM-03 Knowledge KM-03 · Project Scope Management ELO 1–2 Voice study Walk a live requirement with the host by voice; draft WBS first two levels WBS sketch on Digital Paper + tagged voice clip
KM-04 Knowledge KM-04 · Project Time Management ELO 2–3 Voice study Build a 6-week milestone strip for the host project from voice notes Schedule card + critical-path note
KM-05 Knowledge KM-05 · Project Cost Management ELO 2–3 Voice study Voice a cost baseline for one work package; name the cash-flow risk Cost baseline sheet + EVA definitions card
KM-06 Knowledge KM-06 · Project Quality Management ELO 3 Voice study Draft a quality checklist for one host deliverable by voice QA/QC checklist living object
KM-07 Knowledge KM-07 · Project Human Resource Management ELO 3 Voice study Map the 1:3–5 mentor ratio on this cohort; voice a team-conduct note RACI + conduct note
KM-08 Knowledge KM-08 · Project Communications Management ELO 3 Voice study Write the comms protocol: what is said in BusinesSite vs email vs site radio Comms matrix
KM-09 Knowledge KM-09 · Project Risk Management ELO 3 Voice study Voice the top 5 risks on the assigned host project with probability/impact Risk register v1
KM-10 Knowledge KM-10 · Project Procurement Management ELO 3 Voice study List what the host must buy vs what the worker produces; flag POPIA vendors Procurement plan stub
KM-11 Knowledge KM-11 · Project Stakeholder Management ELO 1–4 Voice study Tag each CareerWIL stakeholder card (Milzet, CEDEC, SETA, NYDA, host, worker) with interest/influence Stakeholder map
PM-01 Practical PM-01 · Initiate a project ELO 1 Scenario room Charter + business case for assigned Milzet/BusinesSite project Signed charter PDF + voice walkthrough + VR session recording
PM-02 Practical PM-02 · Plan and develop a project management approach and scope statement ELO 2 Scenario room Scope statement v1 for host project Scope statement + requirements trace
PM-03 Practical PM-03 · Plan and develop a project time line and schedule ELO 2 Scenario room 6–12 week schedule covering stipend shifts and host milestones Schedule + assumption log
PM-04 Practical PM-04 · Plan for and project the cost of a project ELO 2 Scenario room Work-package cost baseline + stipend cost line Cost baseline aligned to WBS and schedule
PM-05 Practical PM-05 · Plan project management systems ELO 2 Scenario room CareerWIL itself used as the PM system of record Systems plan pointing at live objects on the platform
PM-06 Practical PM-06 · Monitor and control the scope of a project ELO 3 Scenario room Live scope-change log on the host project Change requests + validation record
PM-07 Practical PM-07 · Control the project delivery schedules and costs ELO 3 Scenario room Weekly variance voice report EVA snapshot + narrative
PM-08 Practical PM-08 · Control the project quality ELO 3 Scenario room QA checklist executed on a real host artefact (PoE pack, site log, board pack) Signed QA record + photos/stream stills
PM-09 Practical PM-09 · Manage and control the human resources of a project ELO 3 Scenario room Shift roster + 1:3–5 mentor allocation for the cohort HR file notes (POPIA-restricted)
PM-10 Practical PM-10 · Conduct and control project communication and stakeholder interaction ELO 3 Scenario room Weekly stakeholder voice brief in BusinesSite; CareerWIL wall updated Comms log + brief recording
PM-11 Practical PM-11 · Manage and control project risks ELO 3 Scenario room Living risk register on the host project Register + review minutes
PM-12 Practical PM-12 · Manage and control project procurement activities ELO 3 Scenario room One real buy or one simulated buy with host data Procurement file
PM-13 Practical PM-13 · Manage and control project close-out activities ELO 4 Scenario room Close-out pack for a completed work package (or pilot phase gate) Handover certificate + lessons + archive index
WM-01 Workplace WM-01 · Attend to project initiation management processes ELO 1 SUPERVISED-DO WE01 Observe and assist an experienced PM with project initiation processes VR: SHADOW — worker is virtually present on a live initiation meeting via 360/stream; annotates by voice Host work: Sit in (virtually) on charter, feasibility, sponsor buy-in; produce annotated observation journal WE02 Conduct project initiation activities under close supervision of an experienced PM VR: SUPERVISED-DO — worker runs a defined initiation slice; mentor on the stream Host work: Draft business case + charter Date/time, host, experienced PM name, what was observed, what was assisted, hours, mentor sign-off | Artefacts produced, supervision notes, competency judgement against ELO 1 AAC
WM-02 Workplace WM-02 · Attend to project planning processes ELO 2 SUPERVISED-DO WE01 Observe and assist an experienced PM with project planning processes VR: SHADOW — planning workshop stream (scope, schedule, cost, systems) Host work: Annotate a live planning session; extract WBS / schedule / baseline fragments WE02 Conduct project planning activities under close supervision VR: SUPERVISED-DO — worker owns a work-package plan Host work: Produce scope statement, schedule, cost baseline and systems plan for a live package Observation journal + assisted artefacts + hours (this WM is 20 credits — needs volume) | Plan pack IDs, supervision, AAC vs ELO 2
WM-03 Workplace WM-03 · Attend to project execution and control processes ELO 3 SUPERVISED-DO WE01 Observe and assist an experienced PM with execution and control VR: SHADOW — site or ops stream; 360 camera on supervisor (already on CareerWIL job spec) Host work: Daily site / ops log drafted from the stream; flag risks, quality, comms WE02 Conduct execution and control activities under close supervision VR: SUPERVISED-DO — worker runs a control cycle (scope/schedule/cost/quality/HR/comms/risk/procurement) Host work: Weekly control pack: variance, EVA narrative, quality walk, stakeholder Daily logs, risk flags, hours, mentor initials | Control pack IDs mapped to PM-06..PM-12 + ELO 3 AAC
WM-04 Workplace WM-04 · Attend to project close out processes ELO 4 SUPERVISED-DO WE01 Observe and assist an experienced PM with close-out processes VR: SHADOW — handover meeting stream; archive crate visible Host work: Observe transfer of deliverables, lessons, demobilisation, client satisfaction WE02 Conduct project close-out activities under close supervision VR: SUPERVISED-DO — worker produces the close-out pack Host work: Handover certificate, lessons learned, resource release, contract-admin checklist Observation of close-out meeting + assisted archive index | Close-out pack + host acceptance + AAC vs ELO 4