SAQA 101869 · Curriculum 121905000

Module library

Occupational Certificate: Project Manager — 240 credits. Worker-task language on every card. Assessor / QCTO terms stay behind the toggle on each detail page.

KM · 4 cr

KM-01 · Introductory Studies for Project Managers

Voice induction: record a 4-minute 'why this work, why this host' brief; answer ethics scenario by voice

Voice study / formative

KM · 4 cr

KM-02 · Project Integration Management

Dictate a one-page project charter for the assigned host project; list integration points across scope/time/cost

Voice study / formative

KM · 8 cr

KM-03 · Project Scope Management

Walk a live requirement with the host by voice; draft WBS first two levels

Voice study / formative

KM · 8 cr

KM-04 · Project Time Management

Build a 6-week milestone strip for the host project from voice notes

Voice study / formative

KM · 8 cr

KM-05 · Project Cost Management

Voice a cost baseline for one work package; name the cash-flow risk

Voice study / formative

KM · 8 cr

KM-06 · Project Quality Management

Draft a quality checklist for one host deliverable by voice

Voice study / formative

KM · 8 cr

KM-07 · Project Human Resource Management

Map the 1:3–5 mentor ratio on this cohort; voice a team-conduct note

Voice study / formative

KM · 8 cr

KM-08 · Project Communications Management

Write the comms protocol: what is said in BusinesSite vs email vs site radio

Voice study / formative

KM · 8 cr

KM-09 · Project Risk Management

Voice the top 5 risks on the assigned host project with probability/impact

Voice study / formative

KM · 8 cr

KM-10 · Project Procurement Management

List what the host must buy vs what the worker produces; flag POPIA vendors

Voice study / formative

KM · 8 cr

KM-11 · Project Stakeholder Management

Tag each CareerWIL stakeholder card (Milzet, CEDEC, SETA, NYDA, host, worker) with interest/influence

Voice study / formative

PM · 4 cr

PM-01 · Initiate a project

Charter + business case for assigned Milzet/BusinesSite project

Initiation studio: business-case wall, charter table, feasibility tray, team pick, tool pick

PM · 8 cr

PM-02 · Plan and develop a project management approach and scope statement

Scope statement v1 for host project

Scope studio: requirements board → scope statement → exclusions list

PM · 8 cr

PM-03 · Plan and develop a project time line and schedule

6–12 week schedule covering stipend shifts and host milestones

Schedule studio: sticky-note network → Gantt strip → critical path highlight

PM · 8 cr

PM-04 · Plan for and project the cost of a project

Work-package cost baseline + stipend cost line

Cost studio: WBS cost roll-up, baseline ribbon, cash-flow risk pins

PM · 8 cr

PM-05 · Plan project management systems

CareerWIL itself used as the PM system of record

Systems studio: five cabinets — quality, HR, comms, risk, procurement

PM · 8 cr

PM-06 · Monitor and control the scope of a project

Live scope-change log on the host project

Change-control booth: incoming request → impact → accept/defer

PM · 8 cr

PM-07 · Control the project delivery schedules and costs

Weekly variance voice report

Control room: baseline vs actual, EVA tiles (PV/EV/AC/SPI/CPI)

PM · 8 cr

PM-08 · Control the project quality

QA checklist executed on a real host artefact (PoE pack, site log, board pack)

Quality walk-through: 360 of a deliverable + defect pins

PM · 8 cr

PM-09 · Manage and control the human resources of a project

Shift roster + 1:3–5 mentor allocation for the cohort

Team room: roster, conduct case, performance note

PM · 8 cr

PM-10 · Conduct and control project communication and stakeholder interaction

Weekly stakeholder voice brief in BusinesSite; CareerWIL wall updated

Briefing gallery: record a stakeholder update facing a virtual board

PM · 8 cr

PM-11 · Manage and control project risks

Living risk register on the host project

Risk huddle: heat map, response cards, residual risk

PM · 8 cr

PM-12 · Manage and control project procurement activities

One real buy or one simulated buy with host data

Procurement desk: RFQ tray, evaluation grid, contract close

PM · 8 cr

PM-13 · Manage and control project close-out activities

Close-out pack for a completed work package (or pilot phase gate)

Handover hall: deliverable transfer, lessons wall, demobilisation list, archive crate

WM · 10 cr

WM-01 · Attend to project initiation management processes

WE01 Observe and assist an experienced PM with project initiation processes VR: SHADOW — worker is virtually present on a live initiation meeting via 360/stream; annotates by voice

SHADOW — worker is virtually present on a live initiation meeting via 360/stream; annotates by voice · SUPERVISED-DO — worker runs a defined initiation slice; mentor on the stream

WM · 20 cr

WM-02 · Attend to project planning processes

WE01 Observe and assist an experienced PM with project planning processes VR: SHADOW — planning workshop stream (scope, schedule, cost, systems) Host work: Annotate a live planning

SHADOW — planning workshop stream (scope, schedule, cost, systems) · SUPERVISED-DO — worker owns a work-package plan

WM · 20 cr

WM-03 · Attend to project execution and control processes

WE01 Observe and assist an experienced PM with execution and control VR: SHADOW — site or ops stream; 360 camera on supervisor (already on CareerWIL job spec) Host work: Daily site

SHADOW — site or ops stream; 360 camera on supervisor (already on CareerWIL job spec) · SUPERVISED-DO — worker runs a control cycle (scope/schedule/cost/quality/HR/comms/risk/procurement)

WM · 10 cr

WM-04 · Attend to project close out processes

WE01 Observe and assist an experienced PM with close-out processes VR: SHADOW — handover meeting stream; archive crate visible Host work: Observe transfer of deliverables, lessons,

SHADOW — handover meeting stream; archive crate visible · SUPERVISED-DO — worker produces the close-out pack

Open mapping matrix